Wählen Sie Ihr Land:
Choose your country:
Wybierz swój kraj:
Choose your country:
Choose your country:
Välj språk:
Choisissez votre pays:
選擇您的國家
Based on your browser language, we recommend the following version of this page:
Basierend auf Ihrer Browsersprache empfehlen wir die folgende Version dieser Seite:
Based on your browser language, we recommend the following version of this page:
W oparciu o język przeglądarki zalecamy następującą wersję tej strony:
Based on your browser language, we recommend the following version of this page:
Based on your browser language, we recommend the following version of this page:
Baserat på ditt webbläsarspråk rekommenderar vi följande version av denna sida:
En fonction de la langue réglée dans votre navigateur, nous vous recommandons la version suivante de cette page :
Deutsche Windtechnik has been providing full maintenance for the Buchonia wind farm in Schlüchtern/Sinntal (Rhön - Hessen) since 2016. The long-term service agreement includes all service and maintenance work, upgrades, repairs, total losses and large component replacements as well as the creation of all necessary reports for the nine Senvion 3.2M systems. Deutsche Windtechnik began its business of providing service from the time of commissioning with the contract with Buchonia Wind GmbH & Co. KG, making this an important milestone in the history of the company.
Independent service from the start
The operating company was prepared to break new ground right from the beginning and was able to achieve cost savings by negotiating with several service providers. The professionalism, the transparent communication and the extensive scope of the overall service offerings was reason enough to choose Deutsche Windtechnik for this project. “The expectations that Deutsche Windtechnik has of itself regarding quality surpass those of any manufacturer that I am familiar with. We receive services from Deutsche Windtechnik in the overall package that are equivalent at the very least,” said Marius Heinemann, Managing Director of Buchonia Wind GmbH & Co. KG.
New systems for more reliability and less downtime
In recent years, operators and Deutsche Windtechnik have made further improvements to the system technology. Among other things, the existing bat shutdown system was upgraded and a rotor blade ice detection system (type: polytech fos4X) was installed, which reduced downtimes due to weather conditions.
The nine Senvion 3.2M systems achieved an above-average yield in 2020 and are doing very well with an availability of over 99%.
The facts at a glance
Carrier: Buchonia Wind GmbH & Co. KG
Start of the cooperation: 2016
Service: Full maintenance including large components
Plant types: 9 Senvion 3.2 M114 (rated power 3200 kW, HH 143 m, diameter 114 m) 28.8 MW
Total output: 28.8 MW